Individual-Project-1-Traditional-manufacturing-methods-management-homework-help

1,000 -1,500 words

Deliverable requirements addressed; understanding of material and writer’s message and intent are clear.

35%

Scholarly research supports the writer’s position and is properly acknowledged, and cited direct quotations may not exceed 10% of the word count of the body of the assignment deliverable (excluding title page, abstract, table of contents, tables, exhibits, appendices, and reference pages). Inclusion of plagiarized content will not be tolerated and may result in adverse academic consequences.

20%

Critical thinking: Position is well-justified, there is logical flow, and there are examples.

20%

Structure: Includes introduction and conclusion, proper paragraph format, and reads as a polished, academic paper or professional presentation, as appropriate for the required assignment deliverable.

10%

Mechanical: No spelling, grammatical, or punctuation errors.

10%

APA: Deliverable is cited properly according to the APA Publication Manual (6th ed.).

5%

You have recently been hired as a project manager by the CEO of the ABC Firm, a large manufacturing firm (just one division of the XYZ Conglomerate Corporation). The CEO of ABC has been a manufacturing executive since the beginning of the 1950s. He and most of the managers and supervisors are steeped only in traditional manufacturing and operations methods, which are outdated. The board of directors has been concerned about lagging results of ABC versus its more modern thinking competitors.

You were hired by the CEO as the project manager with the specific charge to changeover ABC’s outdated manufacturing, forecasting, and scheduling systems to more modern methodology. You have successfully accomplished this very same task at 7 different companies over the last 20 years, so you feel confident that you can get the transition to occur, although you do have some reservations. However, with the patience of the board and the understanding by the CEO and most of the managers, you can show them how different life will really be under the new operations paradigms.

After your working lunch with the CEO, he asked you to prepare a memo, specifically for the senior management team, dealing with demand management and forecasting. As the CEO is a practical type of team leader, he asked that you specifically describe the following points in your memo:

  • Traditional manufacturing methods
  • Pros of traditional manufacturing methods
  • An in-depth description of at least 2 issues faced by most manufacturing firms that have traditional manufacturing methods
  • Contemporary methods to overcome the cons without losing the advantages of the traditional method

Please submit your assignment.

 
Do you need a similar assignment done for you from scratch? We have qualified writers to help you. We assure you an A+ quality paper that is free from plagiarism. Order now for an Amazing Discount!
Use Discount Code "Newclient" for a 15% Discount!

NB: We do not resell papers. Upon ordering, we do an original paper exclusively for you.